

Cusum Energy conducted an energy audit at a logistics facility in Mombasa, Kenya to evaluate energy performance, identify inefficiencies, and recommend practical efficiency improvements aligned with operational needs.
As climate action becomes a strategic priority for organizations worldwide, carbon credits are playing an increasingly central role in emissions management. However, the effectiveness and credibility of these credits depend heavily on their underlying project type.
When was the last time your facility’s electrical system was professionally assessed?
Many organizations assume their electrical systems are functioning properly simply because everything appears to be working. However, hidden electrical faults can remain undetected for long periods, only becoming visible when they cause equipment failure, operational downtime, or even serious safety incidents.
When was the last time your facility’s electrical system was professionally assessed?
Hidden electrical faults can remain undetected until they cause serious operational or safety risks.
Recently, Cusum Energy conducted an Electrical Condition Survey for one of our clients as part of our commitment to ensuring safe, reliable, and efficient electrical systems.
Cusum Energy Limited
House 22, Metropolitan Estate, Prof David Wasawo drive, off Riverside Drive
Tel: +254 202353000
Mobile: +254 114590000
Mobile: +254 728153000